Inputs needed for a Non-Residential LEED calculation:

Below is a list of tabs in which you need to enter information for a non-residential LEED calculation. You will not need to enter every available input in each tab.

Building icon:

Project Design Data, Project Title, Designer, Lighting Designer (if lighting is part of your scope), Mechanical Designer (if Mechanical is part of your scope), Outdoor (if outdoor lighting is in your scope), Utility

Plant Icon:

Heating Hot Water (if you have a boiler for space heating which is separate from the domestic hot water heater), Chiller Water (if you have a built up HVAC system with a chiller) Hydronic (if you have a ground coupled system) Domestic Hot Water (unless DHW is not in the scope), Renewables, Exceptional

System Icon:

System Icon

General, Distribution

Zone Icon:

Zone Icon

         

General, Lighting, Mechanical (if you have zonal mechanical boxes or wish to adjust the ventilation), schedules

Room Icon:

Room Icon

General, Infiltration, Occupant, Receptacle/Process, exhaust fan, lighting (if you are taking task or daylighting credits).

Within the Room icon, you will enter building assemblies such as Roofs, Walls and floors by right clicking on the room icon and selecting Add …